
LAN Installer Training Program
The DINTEK Certified Installer (DCI) course curriculum, and the documentation & test-result imaging required to certify a 25-year structured cabling warranty.
Compiled from Dintek_Installer Training Program.html and DINTEK_Warranty_Program.pdf.
“Cabling system performance is not just a matter of purchasing top quality cable and connecting components. Ensure that maximum bandwidth potential is realized when the structured cabling system is correctly designed and professionally installed.”
— DINTEK Installer Training Program
DINTEK has presented its installation courses for over 12 years, training cable installers and network engineers across Asia, Africa, the Middle East, Australasia and Europe. The DCI curriculum mixes theory sessions, design exercises and practical labs, and covers termination and testing to the latest standards — regardless of the brand of components on site.
Curriculum & practical workshops

Course curriculum
- UTP basics & cabling standards
- Structured cabling systems (SCS)
- SCS installation practices
- Performance testing & troubleshooting
- Fiber optic theory
- Fiber components & installation
- Mechanical & fusion splicing
- Fiber optic testing & OTDR basics
Practical workshops
- Cat.6 passthrough patch cord termination
- Cat.6 ezi-TOOL™ termination
- Cat.6A SFTP termination
- Fluke testing workshop
- Fiber optic preparation
- Ezi fiber mechanical connection
- Fiber optic fusion splicing
- Fiber optic testing
Eight theory sessions, in order
Each session is followed by practical work before the class moves on.
Twisted-pair basics
Cabling types, where each should be used, and the governing cabling standards.
Structured cabling systems
SCS components and the standards that relate to them.
Installation practices
Latest structured cabling installation practices, so the finished cabling complies with the relevant standards.
Testing & troubleshooting
Testing and troubleshooting cabling systems with a view to obtaining a DINTEK 25-year warranty.
Fiber optic theory
What fiber is, how it’s made, and how it works.
Fiber cables & components
The different types of fiber cable and components, and the standards for installing each in different environments.
Splicing & termination
The two main connection methods — fusion splicing and mechanical termination.
Optical loss testing & OTDR
Optical loss testing and OTDR theory basics — taking readings and interpreting the results.
What certification covers
The program offers a 25-year, standards-based system-performance and application-assurance warranty for all certified and registered DINTEK cable links, meeting the minimum performance requirements of the relevant ANSI/TIA or ISO Commercial Building Telecommunications Cabling Standards.
Product warranty
Certifies that all products covered will be free from defects in material and workmanship.
System performance
Certifies that cable and connecting hardware will meet or exceed the performance requirements of its rated standard, for up to 25 years.
Application assurance
Certifies that any application designed to run on the certified system will continue to run for up to 25 years.
Documentation & test-result imaging
Registration happens through the logged-in installer area of the DINTEK site, or by manual form. Whichever route is used, the submission must include:
- Correctly completed forms— installer, customer and project details
- Test results, direct from testers— exported, not retyped
- As-built plans— floor layouts showing outlet locations and numbering
- Reference information— an accurate snapshot of the completed system
Field testing is always required, using certified performance testers such as Fluke Versiv. Because the permanent-link test is what the warranty is measured against, the results are captured — imaged — directly from the tester rather than transcribed by hand.

Fluke Versiv testers. Pass/fail link results are pulled straight from the device as the warranty’s raw evidence.

The installer-portal application form, where test files and floor layouts are attached to the submission.

Horizontal System Statement and Conformance Declaration — part of the paper trail alongside the As-Built Drawings.

What a satisfied submission produces: the 25-Year Warranty certificate, sample shown.

The work the imaging documents: a certified installer terminating cabling at the rack before testing and sign-off.

Scan — or click — to reach DINTEK’s 25-Year Warranty Program page.
Documents & testing, in detail
Documents required
- Warranty application form
- Horizontal system statement
- Backbone system statement
- As-built drawings
- Conformance declaration
Testing
Field testing of the installed cabling is always required, using certified performance testers like Fluke. Results are tied to the permanent link and pulled directly from the tester — not entered manually.
Contact us
Questions about the DCI course schedule, seat availability, or the 25-year warranty program? Send a message and the DINTEK team will follow up.

